It does not replace the responsibility of the engineer or project manager.
Artificial intelligence can accelerate quotes, models, and schedules. On-site, it must remain a tool controlled by professionals. Imagine that an infrastructure department needs to quickly review the technical file of a bridge. Plans are piling up, costs are changing, deadlines are pressing. An artificial intelligence (AI) tool promises to summarize documents, compare variants, and spot inconsistencies. The gain of…
The Editorial of the UNIVGA Review ·
Define the authorized tasks: research, pre-writing, comparison, or exploratory calculation.
Assign each final deliverable to an engineer, a BIM manager, or an identified project manager.
Dans le BTP, la modélisation des informations du bâtiment (BIM) rassemble dans une même maquette des plans, matériaux, quantités, coûts, délais et parfois données de maintenance. Les nouveaux outils d’IA promettent d’interroger ces informations, de générer des variantes, de préparer des métrés ou de rédiger des notes de chantier. Certains parlent d’agent d’intelligence artificielle, souvent appelé agent IA, pour désigner un outil capable d’enchaîner plusieurs tâches. Le point clé reste simple : si l’outil se trompe sur une quantité, une règle technique ou une clause, les conséquences peuvent être financières, juridiques et physiques. Bonne nouvelle : bien encadrée, l’IA reste une aide, pas un pilote automatique.
Concrete case: what to do and what not to do
Questions to Ask Before Acting
Does AI only help prepare the work, or does it make a technical decision?
Who signs the final result: the engineer, the project manager, the company, or no one clearly?
Are the data used reliable, recent, and authorized for sharing?
Can we explain how the result was obtained, step by step?
Has the result been compared to a classical method or to a previously validated project?
Does the contract specify the use of AI, data ownership, and responsibilities?
If the tool disappears, changes price, or blocks access, can we recover the project data?
By clicking on "Accept All", you authorize the placement of cookies to facilitate navigation, measure audience, and provide you with information about our training programs. Privacy policy
UNIVGA Group
Set cookies
Necessary cookies remain active. Other categories are optional. Learn more
NecessarySession, security, connection.
PreferencesLanguage and display.
AudienceVisitor statistics.
ProspectingInformation about our training programs.
We detected that you may prefer English. Would you like to switch?